Transmission Line - Northern Section

The project consists of the construction of approximately 3,150 lineal feet of 18” C900 PVC waterline and butterfly valves along the Prairie Trail from Huetter Road to the Industrial Standpipe at the intersection of Hanley Avenue and Carrington Lane. The work also includes the installation of a 12-inch altitude valve and vault. All work shall be in accordance with the contract documents. Valves to be owner furnished. All work will be completed within existing Right of Way and easements. All work shall be in accordance with the contract documents. All bids must be based on the Bidder’s Instructions and Specifications, the descriptions and additional data sheets provided in the Technical Provisions. Data sheets shall be provided as technical references for materials and equipment to be provided under this bid.
  Plans (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
A1 - Coversheet 790.8 KB
A2 - Sheet Index, General Project Notes, Datum and Vicinity Map 1.5 MB
A3 - Legend and Abbreviations 1.2 MB
C0 - Project Overview 1.4 MB
C1 - Plan and Profile 2.2 MB
C2 - Plan and Profile 2.4 MB
C3 - Plan and Profile 2.4 MB
C4 - Plan and Profile 2.2 MB
C5 - Plan and Profile 2.2 MB
C6 - Plan and Profile 2.3 MB
C7 - Plan and Profile 1.7 MB
DT1 - Details 1.6 MB
DT2 - Details 1.3 MB
DT3 - Details 1.0 MB
DT4 - Details 1.2 MB
DT5 - Details 696.5 KB
DT6 - Details 1.1 MB