2021 Chip Seal Project

The SCOPE of the project consists of chip seal on selected roadways in Coeur d’Alene as follows: ½-inch granite chip seal on Government Way from I-90 to Prairie Ave and on Ramsey Road from Hanley Ave to Prairie Ave. Work also includes traffic control, sweeping, and fog seal.
Date Company Contact Bid Categories
1614120430
2/23/21 2:47 pm
Central Washington Asphalt, Inc. P.O. Box 939
Moses Lake, WA 98837-0142
Tracy Cruz
Contract Administrator
Tel: 509-765-5757
Fax: 509-765-8052
1. General Contractor
1614186198
2/24/21 9:03 am
Knife River Mountain West 5450 W. Gowen Rd
Boise, ID 83709
Steve Earl
Chief Estimator
Tel: 208-562-6152
1. General Contractor
1614092800
2/23/21 7:06 am
Poe Asphalt Paving, Inc. 2732 N. Beck Road
Post Falls, ID 83854
Alex Jordan
Tel: 208-777-0498
Fax: 208-777-0499
1. General Contractor
1614014338
2/22/21 9:18 am
Road Products, Inc. PO Box 11072
Spokane, WA 99211
Joshua Polello
Tel: 509-934-1622
Fax: 509-922-9879
1. General Contractor