RFP - Solids Building Improvements - Centrifuge Prequalification AWTF

All labor, equipment, materials, appurtenances and special services, except for installation for a Centrifuge to be installed at the A WTF, including a centrifuge equipment package tested to meet the minimum requirements specified, delivered on site, and all necessary training, startup, and testing for the delivered equipment.
Date Company Contact Bid Categories
1615851652
3/15/21 4:40 pm
APSCO LLC PO Box 2639
Kirkland, WA 98083
Josh Clark
Application Engineer
Tel: 425-822-3335
Fax: 425-827-6171
3. Supplier
1616521178
3/23/21 10:39 am
Alfa Laval 5400 International Trade Drive |
Richmond, VA 23231
Brian Ayres
Applications Engineer
Tel: 2814099102
3. Supplier
1615911816
3/16/21 9:23 am
Flottweg Separation Technology 10700 Toebben Drive
Independence, KY 41051
Alexius Emejom
Tel: 9492044013
3. Supplier
1617908526
4/8/21 12:02 pm
GEA 100 Fairway CT
Northvale, NJ 07647
Perry Pelitera
Tel: 17142628606
1. Prime Bidder
1615829810
3/15/21 10:36 am
Goble Sampson 22526 SE 64th PL
Suite 240
Issaquah, WA 98027
Anya Baniqued
Tel: 425-392-0491
6. Other
1616080236
3/18/21 8:10 am
PDI 1261 Wilson Ave Suite D
Pocatello, ID 83201
Russ Ekins
Lead Estimator
Tel: 208-237-2529
2. Sub Bidder
1616086102
3/18/21 9:48 am
Prospect Construction, Inc. 116 23rd St. SE
Puyallup, WA 98372
Ryan Sondgroth
Estimator
Tel: 253-446-1600
Fax: 253-446-1601
1. Prime Bidder
1615570573
3/12/21 9:36 am
TML Construction Inc. 10186 N Atlas Road
Hayden, ID 83835
Brian Petersen
Tel: 208-762-3611
1. Prime Bidder
1615907312
3/16/21 8:08 am
Treatment Equipment Company 14400 Bel Red Road
Bellevue, WA 98007
Kristin Faulkner
Bidding Specialist
Tel: 4256414306
3. Supplier
1616456479
3/22/21 4:41 pm
Wm. H. Reilly & Co. 910 SW 18th Ave
Portland, OR 97205
Kim Batiste
Project Manager
Tel: 503-223-6197
Fax: 503-223-0845
3. Supplier