RFP - Solids Building Improvements - Centrifuge Prequalification AWTF
All labor, equipment, materials, appurtenances and special services, except for installation for a Centrifuge to be installed at the A WTF, including a centrifuge equipment package tested to meet the minimum requirements specified, delivered on site, and all necessary training, startup, and testing for the delivered equipment.
Plan Holders
Date | Company | Contact | Bid Categories |
3/15/21 4:40 pm |
APSCO LLC
PO Box 2639 Kirkland, WA 98083 |
Josh Clark
Application Engineer
Tel: 425-822-3335
Fax: 425-827-6171
|
3. Supplier |
3/23/21 10:39 am |
Alfa Laval
5400 International Trade Drive | Richmond, VA 23231 |
Brian Ayres
Applications Engineer
Tel: 2814099102
|
3. Supplier |
3/16/21 9:23 am |
Flottweg Separation Technology
10700 Toebben Drive Independence, KY 41051 |
Alexius Emejom
Tel: 9492044013
|
3. Supplier |
4/8/21 12:02 pm |
GEA
100 Fairway CT Northvale, NJ 07647 |
Perry Pelitera
Tel: 17142628606
|
1. Prime Bidder |
3/15/21 10:36 am |
Goble Sampson
22526 SE 64th PL Suite 240 Issaquah, WA 98027 |
Anya Baniqued
Tel: 425-392-0491
|
6. Other |
3/18/21 8:10 am |
PDI
1261 Wilson Ave Suite D Pocatello, ID 83201 |
Russ Ekins
Lead Estimator
Tel: 208-237-2529
|
2. Sub Bidder |
3/18/21 9:48 am |
Prospect Construction, Inc.
116 23rd St. SE Puyallup, WA 98372 |
Ryan Sondgroth
Estimator
Tel: 253-446-1600
Fax: 253-446-1601
|
1. Prime Bidder |
3/12/21 9:36 am |
TML Construction Inc.
10186 N Atlas Road Hayden, ID 83835 |
Brian Petersen
Tel: 208-762-3611
|
1. Prime Bidder |
3/16/21 8:08 am |
Treatment Equipment Company
14400 Bel Red Road Bellevue, WA 98007 |
Kristin Faulkner
Bidding Specialist
Tel: 4256414306
|
3. Supplier |
3/22/21 4:41 pm |
Wm. H. Reilly & Co.
910 SW 18th Ave Portland, OR 97205 |
Kim Batiste
Project Manager
Tel: 503-223-6197
Fax: 503-223-0845
|
3. Supplier |