Atlas Waterfront Park

The SCOPE of the project includes clearing and grubbing, mass excavation and embankment, Suzanne Road extension, a parking lot, concrete plaza, shared-use path, sidewalks, a masonry restroom building, a pole building, an irrigation pump system, rock landscape walls, shoreline stabilization with rockery walls, beach restoration, reinforced concrete water access, wood log boom and pilings, and site irrigation and landscaping . Approximately 1,200 LF of waterline, 2,400 LF of 12" storm sewer, and 2,200 LF of 8" and 10" gravity sewer will also be installed.
  Addendum #1 (click to expand/collapse)
Name Size
20190910 41292.03 Addendum-1 41.8 MB
  Addendum #2 (click to expand/collapse)
Name Size
20190917 41292.03 Addendum-2 55.9 MB
  Addendum #3 (click to expand/collapse)
Name Size
Addendum-3 1.3 MB
  Conformed Documents (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
20190918 41292.03 Atlas Const Bid Docs - CONFORMED Plans FOR ADD1 - ADD3 .0 440.7 MB
20190920 41292.03 Atlas Const Bid Docs - CONFORMED Specs FOR ADD1 - ADD3 .0 41.1 MB