Public Jobs

Bids due in 17 days
5/9/19 2:00 pm
Atlas/Industrial Signal and Trail Gap Project
Welch Comer Engineers
Coeur d'Alene, ID
The SCOPE of the project includes: Installation of a traffic signal at Atlas Road and Industrial Loop, including installing of interconnection equipment at the Kathleen signal and the Centennial Trail pedestrian signal. Project also includes installation of a 10’ wide path on the west side of Atlas from the end of the existing path just south of Industrial loop to the Centennial Trail.
Bidding Closed
4/9/19 11:00 am
2019 CIPP Project
J-U-B Engineers
Coeur d'Alene, ID
The City of Coeur d'Alene, Idaho is requesting Statements of Qualifications (SOQ) from licensed public works contractors who are interested in bidding on the 2019 CIPP Project. The Project generally consists of cured-in-place pipe rehabilitation of approximately 1,770 linear feet of 24-inch diameter sanitary sewer and 2,000 linear feet of 8- to 10-inch sanitary sewer, including cleaning, CCTV inspection, cutting protruding taps, reinstating laterals, and related work.
Bidding Closed
4/12/19 3:00 pm
Water Department Administration and Maintenance Facility
H2A Architects
Coeur d'Alene, ID
New approximately 20,000 SF single story pre-engineered metal building containing office, shops, and maintenance facilities. Work includes related sitework, mechanical, electrical, plumbing, landscaping and other Work indicated in the Contract Documents.
Bidding Closed
3/15/19 4:00 pm
REQUEST for PROPOSALS - Envision Coeur d’Alene
City of Coeur d Alene
Coeur d Alene
The City of Coeur d’Alene (hereafter City) is pleased to present this request for proposals (RFP) to long-range planning and visioning consultants who may wish to be considered for the provision of professional services related to Envision Coeur d’Alene. The City is seeking a forward-thinking and multidisciplinary consultant team that will bring significant expertise and creativity to our city’s unique, multiphase planning project. Consultant teams must be able to perform extensive research, modeling, mapping, and analyses and should be led by experts in planning. In addition, consultant teams must possess a level of expertise sufficient to assist with innovative project planning and community engagement.
Bidding Closed
1/17/19 2:00 pm
2019 Compost Facility Improvements
J-U-B Engineers
Coeur d'Alene, Northern ID
The project consists of the following: Construction of three new compost beds, 56 foot x 75 foot metal building, site work, and associated work.
Bidding Closed
11/15/18 2:00 pm
2018 Seltice Way Sidewalk - Coeur d Alene
City of Coeur d Alene
Coeur d Alene
The project scope is: Construction of an asphalt shared-use path on the south side of Seltice Way, bike lanes from Riverstone Dr. to Northwest Blvd., and modification of the right turn lane onto Northwest Blvd.
Bidding Closed
10/4/18 2:00 pm
Memorial Grandstand Renovation
City of Coeur d Alene
Coeur d’Alene, Northern ID
Work consists of, but may not be limited to, erosion control, miscellaneous demolition, signage, miscellaneous concrete work-flatwork, ramps, dry well installation, catch basin installation, carpentry, HVAC, electrical, painting, roofing, drywall, finish carpentry, doors and hardware, plumbing, resinous flooring, timber and dimensional lumber framing, and other trades as desired in the drawings and specifications and construction staking