Public Jobs

Bidding Closed
11/19/19 11:00 am
Honeysuckle Well Pump Rehabilitation
City of Coeur d'Alene
Coeur d'Alene, ID
The purpose of this project is to remove the pump, inspect the well, and rehab or replace the pump bowls, shafts, spider bearing bushings and other applicable worn parts.
Bidding Closed
11/12/19 2:00 pm
RFP - Parking Management and Enforcement Services
City of Coeur d Alene
Coeur d'Alene, ID
The City of Coeur d’Alene (hereinafter referred to as the “City”) requests proposals from qualified Contractors to provide parking management and enforcement services for the City’s public parking lots, on-street parking within the business improvement district, and boat slip moorage at the City docks. Detailed information regarding the services to be provided can be found in Exhibit “A” – Scope of Work.
Bidding Closed
11/12/19 3:00 pm
Spray Injection Patching Machine, Trailer Mounted
City of Coeur d'Alene
Coeur d'Alene, ID
Generally, the City is seeking one (1) new Spray Injection Patching Machine, Trailer Mounted. Dealers must be licensed pursuant to Idaho Code § 49-1601 et seq. Questions regarding the item should be directed to Jack Reichert, Streets & Engineering Department, 208-769-2480.
Bidding Closed
9/24/19 2:00 pm
Atlas Waterfront Park
City of Coeur d'Alene
Coeur d'Alene, ID
The SCOPE of the project includes clearing and grubbing, mass excavation and embankment, Suzanne Road extension, a parking lot, concrete plaza, shared-use path, sidewalks, a masonry restroom building, a pole building, an irrigation pump system, rock landscape walls, shoreline stabilization with rockery walls, beach restoration, reinforced concrete water access, wood log boom and pilings, and site irrigation and landscaping . Approximately 1,200 LF of waterline, 2,400 LF of 12" storm sewer, and 2,200 LF of 8" and 10" gravity sewer will also be installed.
Bidding Closed
8/22/19 11:00 am
Hubbard Avenue to River Avenue Site Improvements
Bernardo Wills Architects
Coeur d'Alene, ID
The SCOPE of the project includes: Site improvements to the Bureau of Land Management (BLM) Corridor paralleling Northwest Boulevard between Hubbard Avenue to River Avenue in Coeur d’Alene, Idaho. Work includes but is not limited to demolition, clearing and grubbing, grading and earthwork, construction of 12’ wide asphalt trail, irrigation, seeding, landscaping, concrete pads, signage, and relocating of existing boulders.
Bidding Closed
8/12/19 11:00 am
New Storage Bunkers
City of Coeur d Alene - Wastewater Utility
Coeur d'Alene, ID
The purpose of this project is to build a 36x72x18 Shed Style Roof 3:12 Roof Pitch with 4 Open Bays.
Bidding Closed
7/11/19 11:00 pm
12" Water Line Extension (Hedberg/Boyd) Project
City of Coeur d Alene
Coeur d'Alene, ID
The purpose of this project is to improve looping and system pressure of water lines. The work is anticipated to include but not limited to water line construction, paving, traffic control, excavation, and miscellaneous utility work.
Bidding Closed
6/21/19 11:00 am
Huetter Well Project
Welch Comer Engineers
Coeur d'Alene, ID
The City of Coeur d’Alene Huetter Well Project consists of, but is not limited to, the following: • Construction of a new 24-Inch well. • Development of the well. • Plumbness and alignment testing. • Test pumping of the well. • Video tape inspection of the well.
Bidding Closed
6/11/19 2:00 pm
2019 Chip Seal for the Cities of Coeur d'Alene, Hayden, and Dalton Gardens
Welch Comer Engineers
Coeur d'Alene, Hayden and Dalton Gardens
Chip seal on selected roadways in each of the jurisdictions. Coeur d'Alene: 3/8-inch over 2-inch chip seal on Hanley Ave from Ramsey Road to Courcelles Parkway, Seltice Way from the new pavement to Northwest Boulevard, and 15th Street from Best Ave to Dalton Ave. 3/8-inch chip seal on 12th Street and Elderberry Circle, Dalton Ave from Stafford Road to St. Michelle Drive, and Courcelles Parkway from St. Michelle to Hanley Ave. Hayden: 3/8-inch chip seal on Atlas Rd from Hayden Ave to Citation Ave, Valley Way from Hayden Ave to Dakota Ave, Meadow Way from Hayden Ave to Dakota Ave, Reed Rd from Honeysuckle Ave to Hayden Ave, and full length on Placer Ct, and Dee Ct. 3/8-inch chip over 1/2-inch chip on Dakota Ave from Atlas Rd to Ramsey Rd and Reed Rd to US 95, Hayden Ave from Government Way to Pine Valley Ct. Dalton Gardens: 3/8-inch chip seal on 15th Street from Dalton Ave to Deerhaven Ave, and Wilbur Ave between Government Way and 1st Street. Work also includes traffic control, sweeping, and fog seal. Alternate #1 calls for basalt chips, while Alternate #2 calls for granite chips.
Bidding Closed
5/31/19 11:00 am
Fernan Lift Station Retrofit Project
J-U-B Engineers
Coeur d'Alene, ID
Replace (2) existing 10 hp suction-lift pumps with (2) 4 hp submersible pumps, including minor modifications to discharge piping, wet well structure, new valve vault, new pump motor controls and electrical, and a new valve vault.